Project work (Siemens AG)
-
2001 to 2002Processing of the Huntstown / Ireland project (water desalination, dosing W/D circuit, condensate cleaning, steam measurements, boiler pickling)
-
2002 to 2003Processing of the projects Gezer, Haifa and Hagit / Israel (steam measurements, bypass filtration, dosing W/D circuit)
-
2004Evaluation of the water desalination of the Planta Centro power plant / Venezuela
-
2004Participation in the project Taharddart / Morocco (boiler pickling)
-
2004 to 2005Processing of the project New Thalka / Egypt (biocide dosing cooling water)
-
2004 to 2005Processing of the Al Jubail / KSA project (steam measurements, dosing W/D circuit, boiler pickling)
-
2005 to 2006Processing of the project Al Ezzel / Bahrain (water desalination, chlorine production by electrolysis)
-
2005 to 2006Processing of the project Geregu / Nigeria (water desalination)
-
2004 to 2007Warranty processing of the project Phu My 3 / Vietnam. Extension and installation of the chlorine measurement at the cooling tower outlet. Repeated replacement of the electrolysis cells for chlorine production.
-
2008 to 2012Processing of the project Pont sur Sambre / France (water desalination, condensate cleaning, steam measurements, dosing W/D circuit, dosing cooling water, precipitation/flocculation, biological wastewater treatment). Subsequent warranty processing for the Pont sur Sambre project. A total of over 30 assignments on site.
-
2008 to 2009Processing of the project Emile Huchet / France (steam measurements, dosing W/D circuit, dosing cooling water). Training of a new employee on the project.
-
2009Offer processing for the Toul / France project
-
2011Processing of the project Geregu II / Nigeria (water desalination, magnesium precipitation)
-
2012Deployment in the Mellach / Austria power plant with problems in lime precipitation with subsequent evaluation of the operation
-
2013Evaluation of the cooling tower operation of the Berlin Test Facility in Berlin Moabit
-
2013Monitoring of the operation and measurement of the effectiveness of chlorine dioxide in the power plant Marsa / Malta. Afterwards lecture at the VGB conference.
-
2014Experiment on the use of chlorine dioxide in cooling towers in the Merkenich power plant
-
2014 Write a description for this list item and include information that will interest site visitors. For example, you may want to describe a team member's experience, what makes a product special, or a unique service that you offer.
-
2014 to 2015Warranty processing of the Lünen project (precipitation/flocculation for additional water)
-
2015 to 2016Experiment on the suitability of ultrafiltration in power plant operation, operation of the plant for 6 months
-
2016 to 2017Processing of the project Beni Suef / Egypt (first use of a submerged chlorine dioxide generation, cooling tower chemistry, dosing, steam measurements)
-
2016 to 2017Chemical support for the cooling tower chemistry of the Ludwigsfelde project
-
2017Evaluation of the cooling tower operation in the power plant T-Power (Belgium)
-
2017 to 2018Evaluation of the corrosion in the W/D cycle based on hydrogen measurements
-
2018Evaluation of nanofiltration membranes for the selective removal of hardness components from cooling tower circulating water